ER'S Color Solutions

Bathroom Remodeling

3-5 days for an average kitchen; 2-3 days for bathroom vanities
How the work goes
3-5 days for an average kitchen; 2-3 days for bathroom vanities
  • Showers & Tubs
  • Vanities
  • Flooring
  • Fixtures & More

Bathrooms are small rooms with a lot going on — plumbing, waterproofing, tile, ventilation — so the details are what separate a bath that lasts from one that leaks in two years. We handle showers and tubs, vanities, flooring, fixtures, and tile the whole way through.

The part you don't see matters most: proper waterproofing behind the tile, a correctly sloped shower pan, and a fan that actually moves the humidity out so you don't grow mildew. We set tile on the right substrate, not over drywall in a wet area. Vanities, tops, faucets, toilets, lighting, and glass get installed and sealed.

Cleaning and deglossing is critical — cabinets accumulate grease, cooking residue, and silicone from cleaning products that cause adhesion failure if not removed.

Most full bathroom remodels run 2-3 weeks depending on tile selection and whether we're moving the tub or shower location — relocating plumbing adds time and cost, and we'll tell you that up front instead of on the invoice. We keep the demo dust contained, protect the floors on the way in and out, and walk the finished room with you before we pull the last of our tools.

Financing Options Available

Ready to start your bathroom remodeling?

Call Now Free Quote